We are looking to purchase a mobile wastewater container
plant, that can treat up to 100 to 400 cubic meter per day.
Its output should be not more than bod3, to be used for
irrigation, car washing, the unit to be on truck can move
whenever needed and to get stplized in 2 to 3 days.
The unit will remain in each location for 3 to 4 months than
move with the crew to other location, it will be in desert
where temperature goes up to 50c.
date_range Mar 06' 2024/ Malaysia
date_range Jul 21' 2023/ Bahrain
date_range Apr 20' 2023/ Oman
date_range Apr 22' 2022/ Germany