We?re requested to supply / install all equipments to build wind
farms of different sizes in north Italy :
1. Size 1-100-KW?s = different applications,
2. Stand alone (with battery bank, controller, inverter) &
grid connect (bigger sizes) = both.
3. Must have CE else can?t work in EU.
Kindly contact us without delays if you can work.
Thanks
date_range Jun 04' 2025/ Greece
date_range Apr 17' 2025/ UAE
date_range Nov 26' 2024/ India
date_range Feb 12' 2024/ USA