Sourcing for Manufacturer to build a Hybrid Gas/Electric
enclosed Vehicle with two front wheels and one rear wheel.
We want the manufacturer to build from our concept design.
Manufacturer should have the capacity to build at least
1000 unit per month.
date_range Apr 10' 2025/ Oman
date_range Apr 08' 2025/ Cyprus
date_range Apr 08' 2025/ UK
date_range Jan 06' 2025/ Turkey