Requirements to Supplier.
Turn key project implementation
Experience in turn-key boiler equipment installation (please
send us reference list and timing for realization of similar
equipment);
Have all necessary licenses and permissions for performing
such activities in EU or CIS (incl. Russia).
Requirements to boiler equipment.
Boiler should be fueled by degasification methane with
concentration 30-96%. Calculation should be performed for
150-250 cub. m./h of pure methane (500-900 cub m./h of gas
mixture).
Temperature graphic of hot water 70-95
Noxious agent concentration of the exhaust gas from boiler
chimney to atmosphere should meet the sanitary code demands.
Running regime automatic boiler-plant (without operating
personal) with possibility to transfer data to PC.
Boiler plant should be fulfilled in modular implementation
and should comprise:
Gas treatment equipment;
Burner equipment with automatic methane feeding regulation;
Pumping equipment and pipe works;
Electric power supply equipment and panels;
Instrumentation and automated control systems;
Thermal insulation inside the container.
Delivery DDU (Kemerovo, Russia) Incoterms 2000.
Installation works include: assembling of modular boiler
plant, installation of instrumentation and automated control
systems and its check-out works, commissioning work.
date_range Feb 23' 2023/ Australia
date_range Dec 12' 2022/ Thailand
date_range Dec 08' 2022/ Singapore
date_range Aug 09' 2022/ Philippines