• date_rangePosted On :   Aug 09' 2007
  • location_cityCity :   Ural
  • languageCountry :   Russia
  • content_pasteEnquiry No. :   7080939

Buy the complete set of refractory materials for lining
of 100-tons steel ladles

Dear Sirs
Our company is the lead firm of one of the largest metallurgical
holdings of Ural-Siberian region. Really, series of the large
metallurgical plants are included into structure of our holding.
At present time is necessary for us to put into execution the
lining of 100-ton and 30-ton ladles (please see attached pictures
for design of a steel ladle and full technology of fusion of metal).
For this reason now we are interested in acquisition the
complete set of refractory materials for full lining of the
steel ladles.
Below we adduce required working parameters for both ladles:
1) Method and the organization arc-furnace steelmaking
(technological schema). The ladle pot is filling with the fused
metal from several EAF ovens with capacity 25, 15 and 10 tons
(in some cases with repetition of swimming trunks) .
Weight of a processed metal from 30 to 100 tons.
Working regime-continuous.
2) The basic characteristics of a technological cycle:
Ladle capacity-100 or 30 tons (it is important-height of a
freeboard of ladle should be 400 mm and 370 mm correspondingly) .
Time of stay of a steel in a ladle pot from 2 till 8 o'clock.
Time of teeming of steel-30-50 minutes
Time of "empty running"-from 24 till 120 o'clock
Blowing time by argon-till 480 minutes.
Duration of heating-till 450 minutes.
3) Assortment of steel:
Carbon steel-10% ;
Low-alloyed steel-60% ;
Alloy steel-20% ;
Heavily alloyed steel-10% .
4) Ladle temperature: average-1570 C; maximum-1600 C.
5) Temperature of lining before fusing 1100-1200 C.
6) Composition of slag: CaO = 55-60% ; SiO2 = 14-17% ;
FeO = 0. 40-1. 30% .
Slag bed depth-100-300 mm.
Basicity of slag-2. 4-3. 5% .
And, at last, the most important-is desirable, that each lining
withstand without damage not less than 30 swimming trunks!
So, Sirs, we are ready to consider any your offers on the lining
which would correspond to our technological conditions and
we would appreciate very much if you send us, as soon as
possible, the Proforma Invoice (with full specifications of all
components of the lining) on these our Orders on condition of
shipment DAF Zabaikalsk (Manzhouli) by train.
Moreover, please inform us regarding the information of delivery
period, conditions of payment and quality of packing.

PP Woven Bags Manufacturing Plant

date_range Mar 06' 2023/  Taiwan

We deal in selling and distributing advanced plastic processing machinery and equipment. Our website will help you to know more about us. We are going to buy a PP woven...
Importing Indoor Decorative Plants

date_range Jul 01' 2019/  Japan

We are engaged in the Importing & exporting of the seeds and the young plants of the foliage plant and the ornamental plants & the sale of horticultural materials. Please visit our...
Looking to buy Sewage Treatment Plants

date_range Jul 20' 2018/  Saudi Arabia

We have provided Water & Waste Water Treatment Systems & Services since our inception in 1985. Please visit our website to know more. We are looking to buy a Packaged Sewage Treatment...
Power Plant Equipment

date_range May 03' 2016/  Israel

We are a Israel based company. Looking to purchase the power plant equipment. If you can supply us please have a look to our requirement.