• date_rangePosted On :   Jun 08' 2006
  • location_cityCity :   Chittagong
  • languageCountry :   Bangladesh
  • content_pasteEnquiry No. :   6060860

Please be informed that one of our valued clients interested
to set up a sweater factory for making 100 percent acrylic
Sweater, 100 percent cotton Sweater.
Kindly find below their detailed requirement:

1. Plant Type: Sweater Manufacturing Plant.
2. Product: 100 percent acrylic Sweater,
100 percent cotton Sweater
3. Product Range: 3g,5g,7g,9g,12 g,14g.
4. Capacity: 1000 pcs per Day: Considering 7g as standard.

Note: Please mention production capacity for each type of product.

For your kind information, at the time of making proposal
please make a total and complete list of all required
equipment for the following mentioned sections of sweater
manufacturing plant and then you divide your scope of supply
and Clients scope of supply:

Locally purchase and fabricated items so that we can get
the actual list of required equipment:

1. Yarn Checking Section.
2. Winding Section.
3. Yarn Distribution Section.
4. Knitting Section.
5. 1st Inspection section.
6. Linking Section.
7. 2nd Inspection Section.
8. Light Checking section.
9. Embroidery Section.
10. 3rd Inspection Section.
11. Labeling Section.
12. Washing and Drying Section.
13. Ironing Section.
14. Quality Control Section.
15. Final Inspection Section.
16. Packing and Folding Section.

Therefore, if you are in a position kindly provide us a
complete proposal CNF Chittagong, Bangladesh basis for
Sweater Manufacturing Plant.

At the time of making proposal please also include
the followings in your proposal:

1. Detailed description of the process.
2. Also let us know the product range.
Please mention production capacity for each type of product.
Process flow diagram.

3. List of equipments with & detailed technical
specification for both imported and local items separately.
4. Cost of the proposed imported equipment.
5. Separate price of laboratory and product testing
equipment with list, if required.
6. List of locally fabricated items with outline specification.
So that we can estimate the total project cost.
7. Land required for setup the plant.
8. Outline of factory building: Length, width & height
9. Power requirement: Connected load and per hour consumption.
10. Water consumption per hour & per day.
11. Steam requirement per hour & required steam pressure.
12. Name & consumption of any other utilities or consumables,
if required.
13. List of required raw materials and consumption.
14. If possible please send us the picture of proposed items.
18. Charge of supervision of installation and
commissioning separately.
Also let us know the required time for commissioning the
plant & required number of expert people.
19. Estimated freight up to Chittagong port.
20. Payment terms and other commercial terms & conditions.

Waiting for your prospective co-operation

Wanted Flat Wrapping Belts for Farm Machinery

date_range Jun 01' 2020/  Italy

For over 50 years, we have been a leading company in the production and distribution of rubber conveyor belts, industrial hoses in rubber, PVC etc. Please visit our website for...
Ready to buy Packaging Machinery

date_range May 27' 2020/  Maldives

We are importers of logs and also manufacture furniture. We would like to buy Electrical Vacuum Sealers from genuine suppliers. Please contact us with product technical details and reasonable CIF...
Need to buy Branded Printing and Binding Machinery

date_range May 26' 2020/  Sri Lanka

We are Sri Lankan suppliers of office supplies and computer related products. Right now we are looking to buy Muller Martini Saddle Stitchers with stitching heads, cover feeders, knives trimmers,...
Components for Industrial Hydraulic Machinery

date_range Apr 28' 2020/  UK

Our company specializes in the precise production of custom design industrial equipment. Please visit our website to see our products Now we are ready to buy Rubber, Steel, Brass, Stainless...