We have the following requirements:-
Multi Stage Flash Type Desalination Plant required
Application: Solar Concentrator Powered
Specification:-
Plant A 1250m3 per day
Plant B 2500m3 per day
Plant C 5000m3 per day
Operation temp: 80-100 deg. C
Technical support needed - Cost to be specified
Warranty: to be specified
Location-Middle East
date_range Apr 30' 2025/ Qatar
date_range Apr 11' 2025/ Turkey
date_range Mar 17' 2025/ USA
date_range Mar 13' 2025/ Dominican Republic